1. Official Holiday Period
Public Holidays: The Chinese government typically designates 7 days of official holiday (e.g., from Lunar New Year's Eve to the 6th day of the first lunar month).
Factory Closures: Many workshops and factories shut down completely during this period, as workers return to their hometowns. Production halts for at least 1 week, but often longer depending on the company’s policy or industry.
2. Pre- and Post-Holiday Disruptions
Pre-Holiday Slowdown:
Workers often leave 1–2 weeks early to secure transportation (trains, flights, etc.), leading to reduced productivity or early shutdowns.
Supply chain delays may occur as suppliers stockpile materials or slow operations.
Post-Holiday Recovery:
Workers might return 1–2 weeks late due to travel difficulties or extended family time.
Factories need time to restart machinery, replenish raw materials, and rehire temporary workers (some may not return after the holiday).
3. Industry-Specific Factors
Labor-Intensive Industries (e.g., textiles, electronics):
Longer recovery times due to reliance on migrant workers, who may switch jobs post-holiday.
Export-Oriented Workshops:
May face delayed shipments if production resumes slowly, affecting international clients.
Critical Industries (e.g., automotive, tech):
Some factories operate with skeleton crews during the holiday, minimizing downtime.
4. Regional Differences
Coastal vs. Inland:
Workshops in coastal manufacturing hubs (e.g., Guangdong, Zhejiang) often experience longer disruptions due to higher migrant worker populations.
Inland factories may recover faster as workers live closer.
5. Mitigation Strategies
To minimize the impact, many workshops:
Advance Production: Ramp up output 1–2 months before the holiday to build inventory.
Offer Incentives: Bonuses for workers who return on time.
Adjust Schedules: Stagger holidays or negotiate with suppliers/clients to align timelines.
Estimated Total Impact
Short-Term: 2–3 weeks of reduced output (including pre- and post-holiday delays).
Long-Term: Up to 4–6 weeks if supply chain bottlenecks, labor shortages, or logistics issues persist.
If your workshop relies on Chinese manufacturing, plan ahead by 1–2 months to account for potential delays. Communicate closely with suppliers for updates on their reopening schedules and workforce availability.
联系人:孙先生
手机:0086-18069868284
电话:0086-18069868284
邮箱:ultraseal@ultra-genuine.com
地址: 中国浙江省杭州市萧山区北干街道欢腾金座2幢213室